
Shuksan Vans
Summit Series Roof Rack - Sprinter
Indexed listing. WNDR Built doesn't sell this product; the button opens shuksanvans.com.
A roof rack with lighting and a vent-area walkway
The Summit Series combines a roof-mounted gear platform with lighting built into its front fairing. Its crossbar assembly extends around the roof vent, providing a place to step beside the vent opening rather than leaving that area as a gap. Crossbars can be installed in upper or lower positions.
At the rear, a fairing and extra crossbar provide a raised position for gear, while a roller bar runs on bearings. The rack can be ordered with laser-cut decking or without decking, so buyers can choose a decked surface or the crossbar arrangement. Shuksan manufactures and assembles the rack in the Pacific Northwest.
Front-fairing lights
Eleven Diode Dynamics SS3 lights: seven white and four amber.
Aluminum construction
Side rails, front and rear fairings, roller bar, crossbars and optional decking are aluminum, with a mini-texture black powder-coated finish.
Roller bar
The rear roller bar uses ABS bearings.
Manufacturer-listed fitment & checks
Vehicle fitment
As listed by Shuksan Vans
- Sprinter High Roof 144: 2019+ Mercedes Sprinter, following the model-specific installation guide.
- Sprinter High Roof 170: 2007+ Mercedes Sprinter High Roof, as listed on the product page.
Choose the model
Select the model matching your van.
Sprinter High Roof 144
- 144 model
Sprinter High Roof 170
- 170 model
Choose the vent location
Select the layout matching your roof vent position.
Vent in Front
- Front vent layout
Vent in Back
- Rear vent layout
Choose the decking
Both decking choices are listed for each model and vent location.
No Decking
- Rack without optional decking
Fully Decked
- Rack with laser-cut aluminum decking
Lighting wiring required
The installer must wire the lights. Pigtails are included, but a harness with a relay or a controller such as an Auxbeam Controller or an sPod Controller is required.
Hand tools only
For the Sprinter 144 installation, the guide requires hand-tightening with a wrench, not an impact driver, when tightening the fairings, crossbars and side-rail foot bolts.
Front fairing handling
The Sprinter 144 guide warns that the front fairing assembly may be heavy and calls for precautions when installing it.
Roof rails and accessories
Compatible with factory and aftermarket roof rails, Fiamma F45S awning and Shuksan Side Ladder; the side ladder is sold separately.
Specs, parts & installation
Construction and lighting
| Rack components | Aluminum side rails, front fairing, rear fairing, roller bar, crossbars and optional decking |
|---|---|
| Finish | Mini-texture black powder coating |
| Hardware | Stainless steel; the Sprinter 144 guide identifies black oxide and bright stainless finishes |
| Lighting | 11 Diode Dynamics SS3 lights: 7 white, 4 amber |
| Roller-bar bearings | ABS |
Sprinter 144 vent assemblies
| Vent in Front | Four 16” vent crossbars (1x2); two 28” vent bars (1x1 square) |
|---|---|
| Vent in Back | Six 16” vent crossbars (1x2); two 38” vent bars (1x1 square) |
| Front fairing bar | 54” (1x1 rounded) |
Optional decking — Sprinter 144 (2019+)
| Full-width decking | Nine 10” X 54” pieces |
|---|---|
| Vent-area decking | Two 17” X 30” pieces |
What’s in the box
Rack and lighting
Aluminum rack components, roller bar, eleven SS3 lights, light pigtails and stainless steel hardware; decking is included only with Fully Decked.
Sprinter 144 structural parts
Two front side rails, two rear side rails, front fairing, rear fairing, 54” crossbars, one 54” rounded front fairing bar, roller bar and vent assembly parts for the selected vent location.
Sprinter 144 mounting parts
Sixteen aluminum roof-rail pucks with stainless inserts; fairing, vent-crossbar, side-rail, crossbar and roller-bar hardware kits; 5/32 and 5/16 hex wrenches.
Sprinter 144 optional decking kit
Nine 10” X 54” decking pieces and two 17” X 30” vent-area pieces, with 88 each of ¼” button-head bolts (0.5” length), flat washers and drop-in T-nuts.
Installation at a glance
For Sprinter 144 (2019+), an extra set of hands is helpful but not required.
Preassemble the fairings and vent crossbar assemblies, then mount the rack to the roof rails using rail pucks and the supplied mounting hardware. The guide calls for Loctite on the fasteners.
If the van does not have factory roof rails, position the forward edge of the forward-most puck 8.5” from the front roof seam; follow the guide and its video for the remaining placement details.
Protect the roof with a blanket, cardboard or an old yoga mat during installation.
Sprinter 144 tools
- 5/32 and 5/16 hex wrenches, provided in the kit.
- 7/16” wrench, socket or crescent; 3/4” wrench, socket or crescent.
Sprinter 144 assembly sequence
- Assemble the front fairing and lights, rear fairing, and vent crossbar assemblies on a sturdy surface before fitting the rack to the van.
- Install rail pucks, side rails, fairings and crossbars, following the guide’s separate steps for the selected front or rear vent layout.
- Press-fit the roller bar onto its bearings; the guide explains how tightening the rear fairing can seat the bearings if needed.
- Tighten rear fairing, crossbar and front fairing bolts first, then the rear and front side-rail foot bolts.
Optional Sprinter 144 decking
- Use drop-in T-nuts in the crossbars with the specified bolts, Loctite and flat washers.
- Loosely attach all bolts for each decking piece before tightening them.
- Use the 17” X 30” pieces at the vent crossbar area.
Source notes
- Shuksan’s product page lists 2007+ Mercedes Sprinter High Roof; the Summit Sprinter 144 installation guide is titled Sprinter 144 (2019+). The 144 fitment here follows that guide; the 170 fitment follows the product page.
- Shuksan’s product page lists 13 full-width crossbars for Sprinter 144; the Summit Sprinter 144 guide’s package table lists 13 for Vent in Front and 12 for Vent in Back.
- The Summit Sprinter 144 guide’s assembly steps identify one 54” crossbar in the rear fairing and one forward-most crossbar, then three front and seven rear crossbars for Vent in Front, or five front and four rear crossbars for Vent in Back; these do not account for the full quantities in its package table. The disputed full-width crossbar totals are omitted from the listing.
- The Summit Sprinter 144 guide’s front-fairing hardware table lists ¼” jam nuts; step 1e calls them bright stainless Nylok jam nuts. The nut specification is omitted here.
- The Summit Sprinter 144 guide’s rear-vent step 7e says Front Side Rail, while steps 7c–7d place that vent assembly among the rear crossbars. This listing does not repeat the disputed rail label.
Lead Time
Free shipping over $99 to the lower 48; import duties and fees are customer responsibility.
Read Shuksan Vans lead time policy on WNDR BuiltWarranty
Read Shuksan Vans warranty policy on WNDR BuiltReturns
30 days after receipt; 25% restocking fee; custom work, sale items, and gift cards excluded.
Read Shuksan Vans returns policy on WNDR BuiltWhat are people saying?
Find owner feedback, discussions, and installation videos for this product.
Searches use the manufacturer and product name and open in a new tab. Results may include similar products.
WNDR Built Community
Our community blog is coming in the future.
Community · Coming soon